Calendar
Thursday, July 2
- All Day: 2nd Floor Bathroom Closure (East Building)
- 8:00 am–9:00 am: Daily Update from the Welcome Desk
From the Welcome Desk of BYU Marriott:
- The 3rd-floor east is closed for construction.
- Access to the elevators on this floor are restricted
- Access to the stairwells on this floor are restricted
- The 4th-floor south is closed for construction.
- Access to the east stairwell will remain open from the 4th-floor east entrance
- Access to the central elevator is closed as demolition is happening in the surrounding areas.
- Access from the east building to the west is best through floors 1-2
- The 2nd-floor East bathrooms are closed and can not be used.
- The atrium of the east building is now locked and inaccessible; please begin to take new routes in the building to avoid the construction work.
- West Elevator Replacement: 1 of 2 elevators remains closed
- Construction staging area located in the south side parking lot
- All side building entrances to this portion of the parking lot are closed.
- Bike racks are available on the upper campus
- Skylight crane in the north parking lot by the parking structure
- All side building entrances to this portion of the parking lot are closed.
- The 3rd-floor east is closed for construction.
Friday, July 3
- All Day: 2nd Floor Bathroom Closure (East Building)
- 8:00 am–9:00 am: Daily Update from the Welcome Desk
From the Welcome Desk of BYU Marriott:
- The 3rd-floor east is closed for construction.
- Access to the elevators on this floor are restricted
- Access to the stairwells on this floor are restricted
- The 4th-floor south is closed for construction.
- Access to the east stairwell will remain open from the 4th-floor east entrance
- Access to the central elevator is closed as demolition is happening in the surrounding areas.
- Access from the east building to the west is best through floors 1-2
- The 2nd-floor East bathrooms are closed and can not be used.
- The atrium of the east building is now locked and inaccessible; please begin to take new routes in the building to avoid the construction work.
- West Elevator Replacement: 1 of 2 elevators remains closed
- Construction staging area located in the south side parking lot
- All side building entrances to this portion of the parking lot are closed.
- Bike racks are available on the upper campus
- Skylight crane in the north parking lot by the parking structure
- All side building entrances to this portion of the parking lot are closed.
- The 3rd-floor east is closed for construction.